Hi guys,
Working playback for music video. Production is very slow with details but have told me they will be doing a slow motion shot. I've read through the forums and found this:
Wanted to make sure I prep the files correctly:
-singer is from Colombia (probably shooting 23.978)
-I have 10 min of LTC and the music track panned L and R respectively
-will make a new music track that is shortened by 50% (assuming they will shoot at 48fps)
-will also make a new LTC track that is shortened by 50%
It was mentioned that I should keep the pitch correct for both files, but unsure how or why to do this. Any help would be super appreciated.